CDS undertook a range or work depending on the site specific requirements for each school and included the following:
- Site investigation and soakage testing
- Inspection of existing drainage infrastructure
- Flood Risk Assessment reports
- Drainage Strategy and Design work
- SUDs design work and attenuation/detention basin sizing
- Production of specification documents and design drawings